Wednesday, November 30, 2011

Winter project 2011-2012 | Car called "Timing" | Part 17

So, finaly i had som chance to test some of the parts...the Schumi, will be a good one, but little to tricky,sanding,dremleing and so on..since my car have a longer distance between the arm mounts, i can actually use my stock TC arms :D...thats a good thing...so little job now..

First pic of schumi arm installed..



This is the latest a stock front Tamiya TC arm...

Wednesday, November 23, 2011

Winter project 2011-2012 | Car called "Timing" | Part 16

Hi guys, sorry, but there have not been anything new on this one, besides i received my ESC yesterday.

I will run the HW Ezrun system a 25A, with LP zink, and USB programmable box.

Belts will be here next week, il be preorder all "thud-arm/steering" parts next week..can be fun to have them here...i hope the car will work, the only thing that i am worried about is the length of the belt...i wanted 124, i got 128...i have to see

Saturday, November 19, 2011

Relax..

did some serious practice yesterday... Carisma GT14B and the Chunk 2wd was the thing to go for..

ran between 17:30 and 03:00

Winter project 2011-2012 | Car called "Timing" | Part 15

custom front belts are ordered. hope they will come next week =)

Monday, November 14, 2011

Winter project 2011-2012 | Car called "Timing" | Part 14

Parts and test mount.


Maybe this is how it will look later..


Sunday, November 13, 2011

Winter project 2011-2012 | Car called "Timing" | Part 13

So, now it is close :D...so close i can feel the carbonfibre parts :D...i have sorted out all Alu parts, and i hope the ESC, and motor will be here soon to!!

Saturday, November 12, 2011

Winter project 2011-2012 | Car called "Timing" | Part 12

Gear differentials are ordered, and a new motormount, with a better spurgear axle mount system.

Winter project 2011-2012 | Car called "Timing" | Part 11

Spyshots of the new Carbon parts for the Buggy

Tuesday, November 08, 2011

PhatBODIES Chunk C2 | Rebuilding the Diff

So, this is the first time since i bought the car i open up the diff :D....over a year ago since i got the car...

Got me some new diff-rings and cheramic diff balls

As you see the Phat C2 car uses only 1/10th parts, and the transmission case is a Xfactory X6 (4 gear)


Sunday, November 06, 2011

Winter project 2011-2012 | Car called "Timing" : Part 10

So i talked to the guy that doin the CAD of my bluprints for this 2-belt driven buggy, he will next week start CNC all stuff :)


- Posted using BlogPress from my iPhone

Thursday, November 03, 2011

Winter project 2011-2012 | Car called "Timing" | Part 9

Drawing,blueprints....they are shipped to the CAD/CNC guy that helped me with the Carisma tp-parts chassi

Winter project 2011-2012 | Car called "Timing" | Part 8

Parts arrival...finaly